PRE-ASSEMBLY
📦 Staging & Hardware Kitting

📦 Pre-Assembly Material Separation

Separate fasteners into 11 labeled Ziploc bags, stage lumber offcuts, and verify tools before building.

vFINAL Rev A
Hardware Bags
0 / 11
Pairs Windows
4 (YJ)
Cut Parts
0 / 27
🖨️ Output Target: Android Print Service (PT-210 system spooler) Ready
💡
Save Roll Paper: In Android print dialog, select Paper Size Paper Roll not cut or Paper Roll to eliminate blank page feed gaps.
Active Label Layout Preview (384 dots / 48 mm) BAG-1

👥 Personnel Schedule: Solo vs. Pairs

4 Windows with YJ

🗂️ Hardware Bagging Station (11 Bags)

Separate all screws, angles, and ties into labeled gallon Ziplocs.

🛠️ Required Tools & Bit Checklist

Check off tools as you stage them in your work bucket.

0 / 18

📐 Cut Lumber & Panel Stock (27 Pieces)

100% 90° Square Cuts